General Operations Plans for Fiscal Year 2009 (Oct. 2008-Sept. 2009)

SNS

Current Operating Status

Install and commission 4 new instruments:

  1. Cold Neutron Chopper Spectrometer (CNCS) - Beam line 5
  2. Powder Diffractometer (POWGEN) - Beam line 11A
  3. Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) - Beam line 6
  4. Spallation Neutrons and Pressure Diffractometer (SNAP) - Beam line 3

HFIR

Current Operating Status

  • Operate six full-power operating cycles. Each cycle is 23-25 days.
  • Install and commission the US/Japan Cold Triple-Axis Spectrometer on guide CG-4.

 

 

 

 