DTE Energy (Gas) - Commercial and Industrial Energy Efficiency Program   

Last DSIRE Review: 07/11/2012
Program Overview:
State: Michigan
Incentive Type: Utility Rebate Program
Eligible Efficiency Technologies: Equipment Insulation, Water Heaters, Furnaces , Boilers, Heat pumps, Heat recovery, Steam-system upgrades, Programmable Thermostats, Energy Mgmt. Systems/Building Controls, Building Insulation, Windows, Roofs, Motor VFDs, Processing and Manufacturing Equipment, Custom/Others pending approval, Vending Machine Controls, Food Service Equipment, Tankless Water Heaters, Pool Heaters, Infrared Heaters, Cool Roof, Demand Controlled Ventilation
Applicable Sectors: Commercial, Industrial, Local Government, State Government, Institutional
Amount:Custom Measures: $4/MCF of first year energy savings
Whole Building Design Incentive: 50% of cost up to $3,000
Steam Trap Repair/Replacement: $100
Boilers: $2/MBH
Boiler Modulating Burner Control Retrofit: $1,250
Boiler Water Reset Control: $400
Boiler Tune-Up: $150 - $1,000
Furnace Tune-Up: $50 - $150
High Efficiency Furnace $250 - $350
Pipe Wrap - Steam Boiler: $6/Linear Foot
Infrared Heaters $5/MBH
Chilled Water Reset $1/Ton
Variable Frequency Drive on Secondary Chilled Water Pump $10/HP
Roof Insulation: $0.10/Sq. Ft.
Cool Roof: $20/1000 sq ft of area covered
Programmable Thermostat (Gas Heat): $50
Energy Management for Chilled Water System $0.005/Sq. Ft.
Demand Controlled Ventilation: $0.05/Sq. Ft.
Hotel Guestroom Energy Management Control (Gas Heat) $35
Water Heater: $35-$50
Tankless Water Heater: $150
Indirect Domestic Water Heater: $0.50 - $1.25/MBH
Pool Heater: $2/MBH
Clothes Washer: $50
Pipe Wrap: $4-$6/ln. ft.
Truck Loading Seals: $100 or $200
Greenhouse Heat Curtain: $0.20/sq. ft.
Greenhouse Film:$0.05/sq. ft.
Steam Cookers: $750 - $900
Convection/Combination/Rack Ovens: $300 - $900
Fryers/Griddles: $200 - $300
Evaporator Fan Motor Controller: $30/controller
Maximum Incentive:Custom Measures: $25,000/site/year for all projects, and $100,000/program across all facilities each year
Roof Insulation: $100 per 1000 Sq. Ft. Roof Area
Energy Management for Chilled Water System: $5 per 1,000 SF of Conditioned Floor Area
Demand Controlled Ventilation: $50 per 1,000 Sq. Ft.
Equipment Requirements:See program web site for full requirements
Web Site: http://www.dteenergy.com/businessCustomers/saveEnergy/rebates/pre...
Summary:

DTE Energy's Commercial Your Energy Savings Program provides prescriptive incentives, predominantly on a simple per unit basis. Custom incentives are based on the amount of estimated annual energy savings and apply to all energy efficiency improvement measures that are not eligible for a prescriptive incentive. The New Construction and Remodeling Program provides design assistance and incentives for more efficient buildings by installing energy-efficiency equipment and controls that are not required by building energy codes and are above standard construction practices.

Any purchaser of a qualifying energy efficiency measure in DTE's service area can participate in the program as long as the measure is installed in a business facility. The DTE Energy program will only pay incentives for energy saved from Detroit Edison and MichCon service areas, but all utilities in Michigan will offer similar programs. A custom incentive can be paid by two utilities for the same measure only if the measure saves both gas and electricity. Customers are defined by a unique taxpayer ID although exceptions may apply for very large organizations that have separate decision making and approval groups.

To participate, customers should first verify that a project is eligible, and wait to begin work until they receive a reservation letter from the utility. The customer then has 90 days to begin installing equipment or systems. A final application received within 60 days after project completion or by December 15 of the program year, whichever comes first. DTE Energy’s Your Energy Savings Staff will review the final project documentation, and a post-inspection may be required for verification purposes. Incentive payments will typically be sent within 4 to 6 weeks from the time that all the documentation is received and the field inspection is complete.

Projects that are not eligible for an incentive include:

  • Fuel switching (e.g. electric to gas or gas to electric)
  • Changes in operational and/or maintenance practices or simple control modifications not involving capital costs
  • On-site electricity generation
  • Projects that involve peak-shifting (and not kWh savings)
  • Projects involving renewable energy

Incentives paid through this program may be considered taxable income, and the program is required to report the incentive using the IRS Form 1099 if it is more than $600 for certain types of firms. Incentives will be paid only after the project has been completed and the final application has been submitted, reviewed, and approved.


 
Contact:
  DTE Energy
Your Energy Savings
3031 W. Grand Blvd, Suite 506
Detroit, MI 48202
Phone: (866) 796-0512
Phone 2: (313) 297-4110
Fax: (877) 607-0744
E-Mail: YourEnergySavings@kema.com
Web Site: http://www.dteenergy.com/businessCustomers/saveEnergy/
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2012 - 2013 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.