Program Overview:
State: New Jersey
Incentive Type: Interconnection
Eligible Renewable/Other Technologies: Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass, Geothermal Electric, Anaerobic Digestion, Tidal Energy, Wave Energy, Fuel Cells using Renewable Fuels
Applicable Sectors: Commercial, Industrial, Residential, Nonprofit, Schools, Local Government, State Government, Fed. Government, Multi-Family Residential, Agricultural, Institutional
Applicable Utilities:Investor-owned utilities (electric distribution companies)
System Capacity Limit:No limit specified
Standard Agreement:Varies by system size
Insurance Requirements:"Additional" liability insurance not required for systems that meet certain technical standards
External Disconnect Switch:Not required for systems that meet certain standards
Net Metering Required:No
Web Site: http://www.njcleanenergy.com/renewable-energy/programs/net-meteri...
Authority 1:
Date Enacted:
N.J. Stat. ยง 48:3-87
1999 (subsequently amended)
Authority 2:
Date Enacted:
Date Effective:
N.J.A.C. 14:8-5.1 et seq.
09/13/2004 (subsequently amended)
10/04/2004
Summary:

New Jersey's interconnection standards apply statewide to all electric distribution utilities, but not to the small number of municipal utilities and electric cooperatives in the state. The rules, first adopted in 2001, have been revised several times since their inception, most recently in May 2012. The current standards include the following basic provisions:

  • Systems powered by Class I renewable energy resources are eligible. This includes solar, wind, fuel cells powered by renewable fuels, geothermal technologies, wave or tidal action, landfill gas, anaerobic digester gas, and sustainable biomass.
  • There are three different levels of review procedures for applications, depending on size and certification. Level 1 applies to inverter-based systems with a capacity rating of 10 kilowatts (kW) or less. Level 2 applies to systems with a maximum capacity of 2 MW that are certified by a nationally-recognized testing and certification laboratory as meeting IEEE 1547 and UL 1741 compliance standards. Level 3 applies to systems that do not qualify for either the Level 1 or Level 2 interconnection review procedures.
  • Fees vary by level. There is no fee for Level 1 interconnection. Level 2 interconnection may include a fee of $50 plus $1 per kW of capacity, as well as the costs of minor system modifications and additional review (subject to BPU approval). Level 3 may include a fee of $100 plus $2 per kW of capacity, as well as charges for actual time spent on any impact and/or facilities studies required by the standard. Charges for additional review under Level 2 or impact or facilities studies under Level 3 may not exceed $100 per hour.
  • Utilities may not require Level 1 and Level 2 customer-generators to install additional controls or external disconnect switches not included in the equipment package, to perform or pay for additional tests, or to purchase additional liability insurance.
  • Interconnection to networks is permitted.
  • Utilities must file interconnections reports with the BPU twice annually. Reports must list, by Class I technology type, the total number of interconnected customers, the total generating capacity of interconnected customers, and the total number of customers interconnected since June 15, 2001.

Interconnection contacts for the state's electric distribution utilities -- Atlantic City Electric, Rockland Electric, PSE&G, and Jersey Central Power and Light -- are available on the program web site listed at the top of this page.  The program web site also contains an on-line form for making complaints to the New Jersey Board of Public Utilities (BPU) in the event that a dispute cannot be resolved directly with the utility. Separate standardized interconnection agreements are used for systems of 10 kW or less and systems larger than 10 kW. These agreements are available on the interconnection web sites of the individual utilities.

History
Legislation enacted by New Jersey in February 1999 required electric distribution companies to offer net metering to residential and small commercial customers with photovoltaic and wind-energy systems. To implement net metering the New Jersey Board of Public Utilities (BPU) adopted interim standards in 2001. In September 2004, the BPU adopted final rules that substantially increased the types and size of systems eligible for interconnection. The final rules clarified and simplified interconnection for most residential and small commercial facilities.

In January 2008, S.B. 2936 made substantial amendments to the net metering law (and interconnection law by extension), most notably extending net metering to large commercial and industrial customers and expanding the list of eligible technologies to include all "Class I" renewable energy resources. The interconnection rule revisions adopted in January 2010 implicitly incorporated these changes by using the definition of "customer-generator" contained in the net metering rules. Other major changes made by the January 2010 adoption include: (1) separating the interconnection rules from the net metering rules and relocating them to a separate section of the administrative code, (2) removing prior language that appeared to limit the standards to systems of 2 MW or less; and (3) adding new interconnection reporting requirements for utilities. The May 2012 adoption made a variety of clarifying changes focused primarily on procedural matters such as timelines, deadlines, and notification requirements.


 
Contact:
  John Teague
New Jersey Board of Public Utilities
2 Gateway Center
Newark, NJ 07102
E-Mail: john.teague@bpu.state.nj.us
Web Site: http://www.bpu.state.nj.us
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2012 - 2013 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.