Rule 21 Smart Inverter Working Group Technical Reference Materials
- Phase 1 Recommendations and Test Plan Documents
- Phase 2 Communications Documents
- Phase 3 Documents
Conference Calls:
Notes from Smart Inverter Working Group Conference Calls
Background Materials:
Dispersed Generation Impact On CE Region Security - European Network of Transmission System Operators for Electricity (ENTSOE)
NOPR RM13-2-000
FERC issued NOPR RM13-2-000 on "Small Generator Interconnection Agreements and Procedures" This includes a proposal for low frequency ride-through in order to avoid what happened in Germany where they are having to retrofit all PV systems (see item 46 on p 29).Generating Plants Connected to the Medium-Voltage Network - Technical Guideline
BDEW German Association of Energy and Water Industries (130 pgs, 1.5 mb)-
EPRI Report 1026809 "Common Functions for Smart Inverters, Version 2"
German Roadmap E-Energy Smart Grid 2.0 (large PDF file)
For more info about these documents contact:
Brian McCollough
Energy Assessments Division
California Energy Commission
1516 Ninth Street
Sacramento, CA 95814
(916) 653-1648