Proposed and Interim Rules
Some documents may
appear in "portable document format" (PDF).
PDF files can be read using the Adobe Acrobat Reader available
free from Adobe. A link to Adobe is available on our links
page.
Proposed Rules
- DRM 16-508, Rulemaking - Puc 800, Underground Utility Damage Prevention Program (DigSafe)
- DRM 15-075 RULEMAKING: Puc 1800 Rules for Energy Conservation Code
- DRM 14-362 RULEMAKING: Puc 1604.07(t) Tariffs and Special Contracts
Substantive comments should
be submitted in accordance with the PUC Rules to the
Executive Director.
|