Document Title
|
|
Aircraft Evaluation Group Personnel Evaluating the Acceptability of Instructions for Continued Airworthiness (ICA)
|
8900.1,Vol.8,Ch5,Sec14
|
Canadair CL-215 -- Date 03/10/1998
|
FSB CL-215
|
Canadair CL-415 -- Date 10/07/1998
|
FSB CL-415
|
Change 156 to 8900.1 -- Dated 05/24/2011
|
8900.1,CHG156
|
Change 172 to 8900.1 -- Dated 09/07/2011
|
8900.1,CHG172
|
Change 198 to 8900.1 -- Dated 04/13/2012
|
8900.1,CHG198
|
Change 367 to 8900.1 -- Dated 11/17/2014
|
8900.1,CHG367
|
Clarification of Intent of Order 8260.3B, Volume 1, Paragraph 1720
|
03/08/2007
|
Clarification of Order 8260.58 Policy Relative to Heading to Altitude (VA) following by Direct to Fix (DF) Legs
|
11/04/2013
|
Clarification of Remote Altimeter Setting Source (RASS) Application to Missed Approach Surface Elevations
|
11/16/2010
|
Clarification to Order 8260.58
|
03/01/2013
|
Continuous Descent Angle on Instrument Procedures
|
03/30/2007
|
Establishing Submission Cutoff Dates for Civil Instrument Flight Procedures
|
8260.26F
|
Eurocopter EC225LP -- Date 06/12/2008
|
FSB EC-225
|
Flight Procedures and Airspace
|
8260.19G
|
Flight Procedures and Airspace
|
8260.19G (Also TERPS)
|
Flight Procedures Management Program
|
8260.43B
|
Inspect Aircraft Modified or Equipped with Night Vision Imaging System
|
AT JTA 2.3.118 (AW)
|
Instrument Flight Procedure (IFP) Periodic Review Requirements Revised
|
01/28/2014
|
Interim Criteria for Precision Approach Obstacle Assessment and Category II/III Instrument Landing System (ILS) Requirements
|
08/16/2011
|
Interim Guidance for Evaluating Area Navigation (RNAV) Holding Patterns
|
06/17/2004
|
Interim Guidance for GPS Holding Leg Length
|
11/27/2006
|
Localizer Directional Aid (LDA) with Glide Slope Procedure Construction Criteria
|
08/28/2008
|
OpSpec/MSpec/TSpec/LOA A447, Emergency Airworthiness Directive Notification (Date -- 09/29/2016)
|
N 8900.386
|
Publish Touchdown Zone Elevation (TDZE) on Instrument Approach Charts
|
01/08/2014
|
Remote Altimeter Setting Source (RASS) Adjustment and Notice to Airmen (NOTAM) Association with Helicopter Point-in-Space (PinS) and Instrument Flight Rules (IFR) to a Visual Flight Rules (VFR) Heliport (IVH) Instrument Approach Procedure (IAP)
|
11/14/2006
|
Required Navigation Performance (RNP) 1 Departure Procedures (DP)
|
01/12/2012
|
Simultaneous Offset Instrument Approach (SOIA)
|
8260.49A CHG 1
|
Special Instrument Procedures
|
8260.60A
|
Standard Threshold Crossing Height (TCH) Values
|
12/29/2011
|
Temporary Waivers to Order 8260.3B, Volume 1, Chapter 3, Paragraph 3.3.2c
|
09/04/2013, #1
|
United States Standard for Locating the Precise Final Approach Fix (PFAF, FAF) on Instrument Approach Procedures and Locating Fixes for Air Traffic Control (ATC) Vertical Separation Purposes
|
02/09/2011
|
Use of NAVAIDs in RNP AR Instrument Flight Procedure Design
|
04/24/2013
|
Use of Step-Down Fixes for Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) Mitigation
|
10/25/2010
|
Waiver to Order 8260.3B, Volume 1, Chapter 3, Paragraph 3.3.2c(1)(b)
|
10/30/2013
|