FSIMS
|
|
|
|
|
Index- Titles Beginning with "P"
|
|
|
Document Title
|
|
P-180 (Avanti, Avanti II), Rev. 4 Date -- 7/26/2010
|
M P-180 R4
|
P-3 (Orion), Rev. 0 Date -- 01/15/2003
|
M P-3 R0
|
P2V-3, Rev. 0 Date -- 07/30/1996
|
M P2V-3 R0
|
P2V Neptune, Rev. 1 Pt 91 Date -- 09/08/2011
|
M P2V R1 Pt91
|
P68 Series, Rev. 5 Date -- 09/30/2002
|
M P-68 R5
|
PA-23 Series, Rev. 6 Date -- 10/06/2009
|
M PA-23 R6
|
PA-31P and PA-31P-350, Rev. 6 Date -- 11/20/2009
|
M PA-31P R6
|
PA-31T, PA-31T1, PA-31T2 and PA-31T3, Rev. 9 Date -- 07/07/2009
|
M PA-31T R9
|
PA-31, PA-31-300, 325, 350, Rev. 10 Date -- 10/23/2009
|
M PA-31 R10
|
PA-34-200/200T/220T, Rev. 7 Date -- 06/05/2003
|
M PA-34-200 R7
|
PA-42 Series, Rev. 6 Date -- 12/08/2008
|
M PA-42 R6
|
PA-44, Part 91, Rev. 6 Date -- 01/23/2003
|
M PA-44 R6 Pt91
|
PA-44, Rev. 6 Date -- 01/23/2003
|
M PA-44 R6
|
PA-46-500TP, Part 91, Rev. 1 Date -- 04/27/2009
|
M PA-46-500TP R1 Pt91
|
PA-46-500TP, Rev. 1 Date -- 04/27/2009
|
M PA-46-500TP R1
|
PA 30 and 39, Part 91, Rev. 4 Date -- 04/28/2006
|
M PA-30 R4 Pt91
|
PA 30 and 39, Rev. 4 Date -- 04/28/2006
|
M PA-30 R4
|
PA 60-600, 601, 601P, 602P, 700P, Part 91, Rev. 7 Date -- 09/11/2006
|
M PA-60-600 R7 Pt91
|
PA 60-600, 601, 601P, 602P, 700P, Rev. 7 Date -- 09/11/2006
|
M PA-60-600 R7
|
Parachute Rigger Handbook
|
H-8083-17
|
Part 121 Flight Release Systems and Supplemental Operating Rules
|
8900.1,Vol.3,Ch25,Sec3
|
Part 121 Pilot-In-Command Operating Experience Observations (PTRS Codes 1356 and 1645)
|
8900.1,Vol.6,Ch2,Sec20
|
Part 129 Operations Specifications Overview and Issuance
|
8900.1,Vol.12,Ch2,Sec2
|
Part 129 Operations Specifications Working Group (129 OSWG) Terms of Reference
|
OSWG Terms of Ref
|
Part 129 Part A Operations Specifications
|
8900.1,Vol.12,Ch2,Sec3
|
Part 129 Part B Operations Specifications—En Route Authorizations and Limitations
|
8900.1,Vol.12,Ch2,Sec4
|
Part 129 Part C Operations Specifications--Airplane Terminal Instrument Procedures and Airport Authorizations and Limitations
|
8900.1,Vol.12,Ch2,Sec5
|
Part 129 Part D Operations Specifications—Aircraft Maintenance
|
8900.1,Vol.12,Ch2,Sec6
|
Part 129 Part H Operations Specifications—Helicopter Terminal Instrument Procedures and Airport Authorizations and Limitations
|
8900.1,Vol.12,Ch2,Sec7
|
Part 133 Airworthiness Related Tasks
|
8900.1,Vol.3,Ch51,Sec2
|
Part 135 Transponder Requirements
|
8900.1,Vol.4,Ch14,Sec15
|
Part 142 Inspections: Surveillance and Inspection Activities for Part 142 Training Centers, Satellites, and Remote Sites
|
8900.1,Vol.6,Ch8,Sec1
|
Part 142 Pictorial Preflight Courseware Review (Date--01/12/2016)
|
N 8900.340
|
Part 142 Training Centers: Deviations and Waivers—Section 142.9
|
8900.1,Vol.3,Ch54,Sec4
|
Part 142 Training Centers: Evaluate Training Programs, Curriculums, Flight Training Equipment, and Recordkeeping Requirements
|
8900.1,Vol.3,Ch54,Sec6
|
Part 142 Training Centers: Training Center and Training Center Program Manager Overview
|
8900.1,Vol.3,Ch54,Sec1
|
Part 142 Training Centers: Training, Qualification, and Designation of Training Center Instructors and Evaluators
|
8900.1,Vol.3,Ch54,Sec2
|
Part A Operations Specifications—General
|
8900.1,Vol.3,Ch18,Sec3
|
Part B Operations Specifications—En Route Authorizations and Limitations
|
8900.1,Vol.3,Ch18,Sec4
|
Part C Operations Specifications–Airplane Terminal Instrument Procedures and Airport Authorizations and Limitations
|
8900.1,Vol.3,Ch18,Sec5
|
Part H Helicopter Terminal Instrument Procedures and Airport Authorizations and Limitations
|
8900.1,Vol.3,Ch18,Sec7
|
Part S—Voluntary Data Submission
|
8900.1,Vol.3,Ch18,Sec12
|
Participate in a Special Certification Review (SCR) Team
|
AT JTA 4.1.206 (OP)
|
Participate in an Accident Prevention Presentation
|
8900.1,Vol.8,Ch4,Sec2
|
Parts A and B Operations Specifications for Part 147 Aviation Maintenance Technician School
|
8900.1,Vol.3,Ch18,Sec11
|
Parts A, B, and D Operations Specifications for Part 145 Repair Stations
|
8900.1,Vol.3,Ch18,Sec10
|
Parts D and E Maintenance MSpecs/OpSpecs/LOAs
|
8900.1,Vol.3,Ch18,Sec6
|
Parts Marking
|
8900.1,Vol.4,Ch14,Sec13
|
Passenger Notice System (Lighted Information Signs)
|
PL-123
|
Passenger Seats Relief
|
PL-079
|
PC-12, Part 91, Rev. 2 Date -- 10/02/2006
|
M PC-12 R2 Pt91
|
PC-12, Rev. 2 Date -- 10/02/2006
|
M PC-12 R2
|
PC-12, Rev. 2a Date -- 02/02/2011
|
M PC-12 R2a
|
PC-12, Rev. 2b Date -- 02/18/2014
|
M PC-12 R2b
|
PC-12/47E, Rev. 2 Date -- 07/16/2012
|
M PC-12 47E R2
|
PC-12/47E, Rev. 2a Date -- 03/03/2014
|
M PC-12 47E R2a
|
PENALTIES
|
FAA 103-272 CH463
|
Perform a Streamlined Administrative Action Process (SAAP) Action
|
AT JTA 1.2.4 (AW)
|
Perform a Streamlined Administrative Action Process (SAAP) Action
|
GA JTA 1.2.4 (AW)
|
Perform an Aircraft Maintainability Evaluation (AME) for an Assigned Aircraft Model (AEG task)
|
AT JTA 4.1.32 (AW)
|
Perform Assigned Telephone Availability
|
8900.1,Vol.8,Ch6,Sec1
|
Perform Field Approval of Major Repairs and Major Alterations
|
AT JTA 3.2.4 (AW)
|
Perform Field Approval of Major Repairs and Major Alterations
|
GA JTA 3.2.4 (AW)
|
Perform Field Approval of Major Repairs and Major Alterations
|
8900.1,Vol.4,Ch9,Sec1
|
Perform Telephone Availability
|
GA JTA 4.8.13 (OP)
|
Personal Ethics and Conduct
|
8900.1,Vol.1,Ch3,Sec2
|
Personal Property Loan Agreements
|
4580.2A
|
Phase 1—Preapplication
|
8900.1,Vol.2,Ch5,Sec2
|
Phase 2—Formal Application
|
8900.1,Vol.2,Ch5,Sec3
|
Phase 3—Document Compliance
|
8900.1,Vol.2,Ch5,Sec4
|
Phase 4—Demonstration and Inspection
|
8900.1,Vol.2,Ch5,Sec5
|
Phase 5—Documentation
|
8900.1,Vol.2,Ch5,Sec6
|
Phases of Certification
|
8900.1,Vol.5,Ch1,Sec3
|
PI Authorizes Part 97 SA Category I Operations Via Issuance of OpSpec/MSpec/LOA
|
AT JTA 5.4.1 (AWO)
|
Pilot in Command: Line Checks: Routes and Airports for Parts 121 and 135 (PTRS Code 1544)
|
8900.1,Vol.3,Ch19,Sec13
|
Pilot Logbooks
|
8900.1,Vol.5,Ch1,Sec8
|
Pitot Heat Indicating System
|
PL-090
|
Plan a Surveillance Work Program
|
AT JTA 2.5.21 (OP)
|
Plan a Surveillance Work Program
|
GA JTA 2.5.21 (OP)
|
Plane Sense
|
H-8083-19A
|
Planning, Scheduling, and Conducting
|
8900.1,Vol.15,Ch12,Sec2
|
Policy
|
8900.1,Vol.12,Ch14,Sec1
|
Policy for Installation of ADS-B OUT Systems (Date - 05/09/2016)
|
N 8900.362
|
Policy on Use of 175 Knots Indicated Airspeed (KIAS) Holding Pattern
|
07/07/2005
|
Policy Regarding Cargo Provisions in the MMEL for Cargo Operations
|
PL-065
|
Policy Regarding MMEL Relief for Primary Thrust Setting Instruments on Two-Engine Airplanes
|
PL-038
|
POLSKIE ZAKLADY LOTNICZE (PZL) M28 SKY TRUCK -- Date 05/17/2006
|
FSB PZL-M28
|
Portable Fire Extinguisher MMEL Requirements
|
PL-075
|
Powerplant
|
8310.6 CH1
|
Powerplant Repairs
|
8900.1,Vol.4,Ch14,Sec12
|
Pre-Application Phase - (Gate I)
|
GA JTA 3.3.196 (OP)
|
Preapplication Phase - Gate I
|
AT JTA 3.3.196 (OP)
|
Preparation of FAA Operating Certificates
|
8900.1,Vol.2,Ch1,Sec4
|
Preparation of Federal Aviation Administration Form 2150-5, Enforcement Investigative Report
|
8900.1,Vol.14,Ch2,Sec2
|
Prepare Federal Aviation Regulations (FAR), Special FAR (SFAR), Draft Orders, and Advisory Circulars (AC)
|
AT JTA 4.1.35b (AW)
|
Prepare Federal Aviation Regulations (FAR), Special FAR (SFAR), Draft Orders, and Advisory Circulars (AC)
|
AT JTA 4.1.224 (OP)
|
Prepare Flight Standards Notifications
|
AT JTA 4.1.221 (OP)
|
PRIA Guidance for FAA Inspectors
|
8000.88
|
PRICING
|
FAA 103-272 CH415
|
Procedures
|
8900.1,Vol.4,Ch11,Sec1
|
|
|
November 15, 2016
|
|
|
|
|