Hereford Inlet - Cape May Inlet
General
USACE District: | Philadelphia | Congressional Dist.: | 2 |
---|
Type: | Shore Protection | Project Length: | 6.1 miles | State: | NJ | Non-Structural: | BEACH_NOURISHMENT |
---|
Structural: | unknown |
---|
Ecosystem Restoration: | No |
---|
Beneficial Use: | No |
---|
Feasibility: | No |
---|
Coastal Location: | Atlantic Coast of Southern NJ |
Project Reliability
The reliability was updated on: 12/13/2011 3:02:
UnconstructedActivities
Date of Next Renourishment: | data unavailable |
---|
Date of Last Renourishment: | data unavailable |
---|
Desired Renourishment Cycle (yrs): | data unavailable |
---|
# of Nourishment Operations: | data unavailable |
---|
Is Erosion Partially Induced by Navigation? | No |
---|
Project Phase: | Study |
---|
Notes: | |
---|
Files & Links
- Sorry, no files exist for this project.