Wallops Island
General
USACE District: | Norfolk | Congressional Dist.: | 2 |
---|
Type: | Shore Protection | Project Length: | 4.5 miles | State: | VA | Non-Structural: | BEACH_NOURISHMENT |
---|
Structural: | OTHER |
---|
Ecosystem Restoration: | No |
---|
Beneficial Use: | No |
---|
Feasibility: | No |
---|
Coastal Location: | Wallops Island to Assawoman |
Project Reliability
The reliability was updated on: 1/19/2012 12:33:
UnconstructedActivities
Date of Next Renourishment: | 2017 |
---|
Date of Last Renourishment: | N/A |
---|
Desired Renourishment Cycle (yrs): | 5 |
---|
# of Nourishment Operations: | data unavailable |
---|
Is Erosion Partially Induced by Navigation? | No |
---|
Project Phase: | Partial construction funds received |
---|
Notes: | |
---|
Files & Links
- Sorry, no files exist for this project.