List filtered by: USACE District = CENWD


Sort: Alphabetically | Geographically (North->South)
Last
Modified
Reliability
Non-Federal.
Project Name
(click on Project Name to view details)
Location
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - San Juan Islands and Strait of Georgia
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - San Juan Islands and Strait of Georgia
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - San Juan Islands and Strait of Georgia
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - San Juan Islands and Strait of Georgia
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - San Juan Islands and Strait of Georgia
5/31/2012
Failing.  25% at half channel availability at maintained depth.
Puget Sound - Whidbey
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - Whidbey
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - South Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - South Central
5/31/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Puget Sound - South Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - South Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - South Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - South Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - South
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - North Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Puget Sound - North Central
5/31/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Puget Sound - North Central
5/31/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Strait of Juan de Fuca
5/31/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Olympic Peninsula Washington Coast
5/31/2012
Moderate. (NAV Only) 75% at half channel availability at maintained depth.
Southwest Washington Coast
5/31/2012
Moderate. (NAV Only) 75% at half channel availability at maintained depth.
Southwest Washington Coast
5/31/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Southwest Washington Coast
5/31/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Southwest Washington Coast
5/31/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Southwest Washington Coast

Reliability Legend: Red: Failed - 0% at half channel availability at maintained depth
Pink: Failing - 25% at half channel availability at maintained depth
Orange: Poor - 50% at half channel availability at maintained depth
Yellow: Moderate - 75% at half channel availability at maintained depth
Green: Good - 95% at half channel availability at maintained depth