List filtered by: USACE District = CESAW


Sort: Alphabetically | Geographically (North->South)
Last
Modified
Beach
Reliability
Project Name
(click on Project Name to view details)

Location

BU

Feas.
unknown
Poor.  Project is late in the renourishment cycle or below the design profile.
NC Region 4c – Dare/Currituck County Line to NC/VA Border
1/29/2013
Poor.  Project is late in the renourishment cycle or below the design profile.
NC Region 4c – Dare/Currituck County Line to NC/VA Border
1/29/2013
Poor.  Project is late in the renourishment cycle or below the design profile.
NC Region 4c – Dare/Currituck County Line to NC/VA Border
1/29/2013
Poor.  Project is late in the renourishment cycle or below the design profile.
NC Region 3b – South of Portsmouth to West of Buxton
1/29/2013
Unconstructed/PURPLE. Project reliability is not applicable for unconstructed projects.
NC Region 3b – South of Portsmouth to West of Buxton
7/3/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
NC Region 1 – SC/NC Border to Brunswick/New Hanover County Line


BU = Beneficial Use

Feas = Feasibility
Reliability Legend Red - Poor. Project is at or below the design profile.
Yellow - Intermediate. Project is late in the renourishment cycle, or the project is performing worse than expected, or both.
Green - Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.
Purple - Unconstructed. Project reliability is not applicable for unconstructed projects.

For projects not yet constructed, the following will be considered: beach width, beach elevation, dune condition and erosion rates rated independently on a red, yellow, green scale.