The Town that Wouldn’t Drown

Butler, Tenn., was constantly inundated with floodwaters from the Watauga River—that is, before TVA built Watauga Dam and moved the whole town to higher ground.

Continue Reading

Valuing Differences, Building Bridges

For this nuclear engineer, it's his work in Diversity & Inclusion that gives his life purpose beyond a paycheck, and he's dedicated to breaking down barriers so that all voices may be heard.

Continue Reading

Whither the Weather

For a meteorologist at the nation’s largest public utility, there’s a lot riding on the line. Forecasts help determine which generation assets go online so you can stay warm—at the lowest cost—on the coldest days.

Continue Reading

The Unified Development of the Tennessee River plan stressed TVA was to provide flood control, navigation and electricity for the region. TVAs dams are tangible evidence of its primary mission: improving life in the Tennessee Valley. We’re celebrating the 80th anniversary of the plan with a yearlong look at 25 dams it inspired.