Milestone |
Date |
Year |
Month |
IBM Punch Card Tabulating Lab Ordering System - No known electronic results. |
Oct 1, 1960 |
1960 |
10 |
Berkeley Scientific Systems Control Data Alpha Lab System
—Data may be on tape but whereabouts unknown. |
Oct 1, 1967 |
1967 |
10 |
Berkeley Scientific Systems Control Data Beta Lab System
—Data may be on tape but whereabouts unknown. |
Oct 1, 1970 |
1970 |
10 |
DCRT Clinical Information Utility Created
Admission Data 1972 with back loads from the beginning.
Lab Data 1975, Chemistry/Hematology Oct 1, 1975- Micro June 1976
MIS Data 1978 each data type at a different scheduled time sent back data from beginning |
1972 |
1972 |
1 |
Honeywell Lab System Implemented |
Oct 1, 1975 |
1975 |
10 |
MIS Implemented |
Jun 14, 1976 |
1976 |
6 |
ADT MIS Interface to Honeywell Implemented |
Jun 1978 |
1978 |
6 |
Order MIS Interface to Honeywell Implemented |
Jun 1979 |
1979 |
6 |
Results Honeywell Interface to MIS: Chemistry/Hematology Implemented |
Jun 1979 |
1979 |
6 |
Compressed 6 Month Cumulative Lab and Micro Report Implemented |
Jun 16, 1980 |
1980 |
6 |
Nutrition DFM System Implemented |
Aug 1988 |
1988 |
8 |
MIS CAS Implemented (TDS Resource Appointment Scheduling, RAS) |
1994 |
1994 |
1 |
Results Honeywell Interface to MIS: Microbiology Implemented |
1994 |
1994 |
1 |
Care Data Interface Engine Introduced |
Apr 1996 |
1996 |
4 |
Care Data Interface Pyxis System Pharmacy Dispensing Feed Implemented |
Mar 1997 |
1997 |
3 |
Cloverleaf (QDX) Interface Engine Introduced |
Jun 1997 |
1997 |
6 |
Care Data Interface CDW ADT Feed Implemented |
Oct 1997 |
1997 |
10 |
SoftMed System Implemented (Initially DRD then Rehab, EEG) |
Nov 1998 |
1998 |
11 |
SCC LIS Implemented (SoftMic, SoftLab, SoftPath) |
Mar 6, 1999 |
1999 |
3 |
CDW Moved from CIT to DNA/DCRI |
Mar 6, 1999 |
1999 |
3 |
SCC LIS SoftBank Implemented |
Sep 18, 1999 |
1999 |
9 |
Decision to Print Lab Report From CDW |
Oct 1, 1999 |
1999 |
10 |
DCRT Clinical Information Utility Implemented Moved To DNA/DCRI |
Nov 1999 |
1999 |
11 |
Care Data Wrist Band System Feed Implemented |
Dec 1999 |
1999 |
12 |
EKG System Implemented |
Sep 5, 2000 |
2000 |
9 |
Cerner RIS Implemented |
Sep 16, 2000 |
2000 |
9 |
Nutrition CBORD System Implemented |
Jan 2004 |
2004 |
1 |
Sunrise Clinical Manager referred to as CRIS/SCM and CRIS Sunrise Implemented |
Aug 21, 2004 |
2004 |
8 |
Hatfield Clinical Research Center Opened |
Apr 2005 |
2005 |
4 |
Scheduling.com Implemented (Replaced MIS CAS) |
Dec 5, 2005 |
2005 |
12 |
CRIS DataMart for CRIS Reporting Implemented |
Jan, 2006 |
2006 |
1 |
Allscripts SCM Upgrade to 4.0 |
Jan 21, 2006 |
2006 |
1 |
SIS Version 4.6 (Inventory and NI Modules) Implemented |
Jun 3, 2006 |
2006 |
6 |
SIS Web for Surgical Scheduling Implemented |
Jun 3, 2006 |
2006 |
6 |
Admissions, Discharge, Transfer, & Patient Registration implemented in CRIS/SCM (Replaced MIS Admissions Module) |
Nov 16, 2006 |
2006 |
11 |
MIS Application Shutdown |
Nov 17, 2006 |
2006 |
11 |
SIS Upgrade 4.7 |
2007 |
2007 |
1 |
Allscripts SCM Upgrade to 4.5 |
Mar 10, 2007 |
2007 |
3 |
MIS Mainframe Shutdown |
Aug 13, 2007 |
2007 |
8 |
MIS Mainframe Surplused |
Sep 21, 2007 |
2007 |
9 |
ProVation Implemented in CC |
Oct 15, 2007 |
2007 |
10 |
NIAID CRIMSON Documentation Interfaced to CRIS |
Dec 12, 2007 |
2007 |
12 |
100% Online Prescriber Trainin Implemented |
April 25, 2008 |
2008 |
4 |
Eclipsys Sunrise Medication Manager Implemented |
May 31, 2008 |
2008 |
5 |
FDCC Desktop Security Requirements Implemented |
Nov 18, 2008 |
2008 |
11 |
Allscripts SCM Upgrade to 5.0 |
Jan 10, 2009 |
2009 |
1 |
EKG Tracings Interfaced to CRIS |
Mar 24, 2009 |
2009 |
3 |
Sign Out Tab made Available in CRIS |
Mar 31, 2009 |
2009 |
3 |
Appointment Tab made Available in CRIS |
Mar 31, 2009 |
2009 |
3 |
Omnicell Pharmacy Dispensing Feed Implemented |
May, 2009 |
2009 |
5 |
QuadraMed AcuityPlus Implemented |
Jun 10, 2009 |
2009 |
6 |
TheraDoc Implemented |
Jun 19, 2009 |
2009 |
6 |
InfoBot tab in CRIS Implemented |
Jul 7, 2009 |
2009 |
7 |
POIS – Perioperative Information System (SIS) for Nursing Implemented |
Jul 27, 2009 |
2009 |
7 |
BTRIS Data Warehouse Made Available |
Jul 30, 2009 |
2009 |
7 |
POIS – Perioperative Information System (SIS) for Anesthesia |
Aug 15, 2009 |
2009 |
8 |
Carefusion Patient ID Barcode Implemented |
Sep 24, 2009 |
2009 |
9 |
NIAAA Documentation Interfaced to CRIS |
Oct 26, 2009 |
2009 |
10 |
ATV II Interfaced Admissions and Demographics to CRIS |
Oct 17, 2009 |
2009 |
10 |
Active Directory Usage on CRIS SCM (ESS) |
Oct 20, 2009 |
2009 |
10 |
Opening of CRC Data Center (migrations from 10/2009 to 3/2010) |
Oct 2009 |
2009 |
10 |
DTI Reporting Implemented |
Jan 31, 2010 |
2010 |
1 |
SIS Phase 2 (Anesthesia and Clin Doc Modules) Implemented |
Feb 16, 2010 |
2010 |
2 |
NIEHS Clinic Opened Using CRIS |
Mar 9, 2010 |
2010 |
3 |
CC Data Center Shutdown |
Mar 2010 |
2010 |
3 |
Medication View Tab Available in CRIS |
Apr 30, 2010 |
2010 |
4 |
OPUS-Respiratory TherapyT Deployment |
Apr 19, 2010 |
2010 |
4 |
36 Hour CRIS SCM Down |
May 13, 2010 |
2010 |
5 |
CRIS Sundown System Implemented |
May 18, 2010 |
2010 |
5 |
Carefusion Laboratory Specimen Barcode Implemented |
Jun 21, 2010 |
2010 |
6 |
Allscripts merged with Eclipsys |
Sep 10, 2010 |
2010 |
9 |
Electronic ICU/Clinical Data Viewer Available in CRIS |
Feb 2, 2011 |
2011 |
2 |
Carefusion Blood Administration Barcode Implemented |
Mar 1, 2011 |
2011 |
3 |
ScriptPro Outpatient Pharmacy System with Integration to CRIS/SCM Implemented |
May 28, 2011 |
2011 |
5 |
Introduction of QuickNotes within CRIS/SCM |
Sep 22, 2011 |
2011 |
9 |
NEI Consult Documentation Interfaced to CRIS |
Oct 4, 2011 |
2011 |
10 |
Admissions Consents Process Made Electronic in CRIS |
Dec 14, 2011 |
2011 |
12 |
Allscripts SCM Upgrade to 5.5 |
Jan 28, 2012 |
2012 |
1 |
Carestream Radiology Information System Implemented |
Apr 20, 2012 |
2012 |
4 |
CRIS Cold Site Implemented |
Aug 30, 2012 |
2012 |
8 |
Pharmacogenomics with HLA Tests within CRIS/SCM Introduced |
Sep 13, 2012 |
2012 |
9 |
Link for PACS Images from CRIS/SCM Implemented |
Dec 2012 |
2012 |
12 |
NCI-Labmatrix Interface Implemented |
Jan 16, 2013 |
2013 |
1 |
Sapphire Replacement with NAS |
Feb 13, 2013 |
2013 |
2 |
Upgrade SmartePaste and Rename as QuickNotes within CRIS/SCM |
Mar 28, 2013 |
2013 |
3 |
Wireless 802.11n Technology in CC Implemented |
Jun 15, 2013 |
2013 |
6 |
AcuityPlus Transparent Documentation Implemented |
Jul 24, 2013 |
2013 |
7 |
Sunrise Patient Portal Implemented |
July 8, 2013 |
2013 |
7 |
Allscripts Knowledge Base Medication Administration Implemented |
Jan 22, 2014 |
2014 |
1 |