3 CSPI Projects List :: US Army Corps of Engineers

List filtered by: USACE District = CEPOH AND State=HI


Sort: Alphabetically | Geographically (North->South)
Last
Modified
Beach
Reliability
Project Name
(click on Project Name to view details)

Location

BU

Feas.
unknown
Poor.  Project is late in the renourishment cycle or below the design profile.
Kauai
3/27/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Kauai
3/27/2012
Unconstructed/PURPLE. Project reliability is not applicable for unconstructed projects.
Oahu
2/1/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Oahu
3/27/2012
Unconstructed/PURPLE. Project reliability is not applicable for unconstructed projects.
Oahu
2/1/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Oahu
3/27/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Maui
3/27/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Maui
3/27/2012
Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.NAV - Good. 95% at half channel availability at maintained depth.
Maui
3/27/2012
Unconstructed/PURPLE. Project reliability is not applicable for unconstructed projects.
Maui
2/1/2012
Unconstructed/PURPLE. Project reliability is not applicable for unconstructed projects.
Maui
2/1/2012
Poor.  Project is late in the renourishment cycle or below the design profile.
Hawaii

BU = Beneficial Use, Feas = Feasibility
Reliability Legend Red - Poor. Project is at or below the design profile.
Yellow - Intermediate. Project is late in the renourishment cycle, or the project is performing worse than expected, or both.
Green - Good. Project is early in the renourishment cycle, or the project is performing better than expected, or both.
Purple - Unconstructed. Project reliability is not applicable for unconstructed projects.

For projects not yet constructed, the following will be considered: beach width, beach elevation, dune condition and erosion rates rated independently on a red, yellow, green scale.