Interstate 10: Live Oak Canyon Road Interchange

Live Oak Canyon off rampSANBAG and the City of Yucaipa worked cooperatively  to widen and realign the Interstate 10  Live Oak Canyon Road interchange in Yucaipa. This project included reconstructing the road between Calimesa Boulevard and Outer Highway South and replacing the current two-lane bridge with a new five-lane bridge. Eastbound and westbound ramps also were widened and realigned, and traffic signals were installed.

  • About this project
  • Project Photos

An early portion of this project – the construction of a new bridge at 14th Street – was completed in 2002. This early project, which cost $1.3 million, helped improve access through the area. The entire interchange project, including the 14th Street bridge early project, cost approximately $22.2 million. 

Construction of the interchange began in September, 2007 and was completed in May 2009.

The project was funded by the state’s Traffic Congestion Relief Program and the City of Yucaipa, which advanced funds that will be repaid from Measure I 2010-2040 revenue. The project was comlpeted on time and within budget.

SANBAG has kept a photo record of the construction on the
Live Oak project since the Ground Breaking event. Select a link to view construction photos for the month. All photos are shown within Adobe Acrobat (pdf) files.

 

 

 

 

Page updated: August 12, 2016