501 |
BPM
System Improvements |
M. Church |
4/24/91 |
|
502 |
Transition
Crossing
Improvements |
M. Church |
4/25/91 |
|
503 |
Deceleratin
Orbit
Improvements |
M. Church |
4/26/91 |
|
504 |
D to A
Line Tuning |
M. Halling |
5/7/91 |
|
505 |
Power
Handling Upgrade of
Debuncher Stochastic Cooling Kicker Tanks |
D. McGinnis |
6/1/91 |
|
506 |
Radiation
Studies in the
Antiproton Source |
M. Church |
6/10/91 |
|
507 |
Missing |
V. Visjnic |
|
|
508 |
Fixing
the Close Orbits in
the Debuncher |
M. Halling |
4/5/91 |
|
509 |
AP0
Target Vault Shielding
Study |
F. Bieniosek |
8/16/91 |
|
510 |
An
Updated AP2 Beamline
TURTLE Model |
M. Gormley
& S. O'Day |
8/23/91 |
|
511 |
A Very
Informal Note on Cooling Pbars from the Main Injector |
J. Marriner |
7/3/91 |
|
512 |
Effect of
Melting on Target
Performance |
F. Bieniosek |
9/10/91 |
|
513 |
Debuncher
Cooling Limitation
to Stacking |
M. Halling |
8/13/91 |
|
514 |
Missing |
V. Visjnic |
|
|
515 |
Site Power |
R.
Oberholtzer |
12/1/91 |
|
516 |
Identification
of New
Operating Tunes for the Accumulator |
M. Halling |
12/4/91 |
|
517 |
Measurement
of Emittance of
Beam Size in the Debuncher Dureing Stacking |
M. Halling |
12/11/91 |
|
518 |
Transverse
Emittance from
SEM Readings |
V. Visjnic |
2/6/92 |
|
519 |
Measurement
of Transverse
Beam Size in Accumulator as a Function of Momenta During Stacking |
M. Halling |
1/22/92 |
|
520 |
Measurement
of Ripple in the
Accumulator Bens Bus Supply |
M. Church |
2/20/92 |
|
521 |
A Review of
Antiproton Source Studies During the Recent Collider Studies Periods |
M. Church |
2/20/92 |
|
522 |
A Review
of Antiproton
Source Studies, 1991 |
M. Church |
2/20/92 |
|
523 |
Measurement
of h in the
Accumulator |
M. Church |
2/20/92 |
|
524 |
A Review
of the 1991 E760 Run |
M. Church |
2/20/92 |
|
525 |
A Study
of the Effects of
Betatron Coupling in the Accumulator Using a Tracking Program |
M. Halling |
2/7/92 |
|
526 |
Recent
Measurement of
Debuncher Longitudinal Beam Size During Stacking |
M. Halling |
2/18/92 |
|
527 |
Calibration
of Accumulator
and Debuncher Scrapers |
A.
Ellerbrock, S. Werkema, & B. Wisner |
3/30/92 |
|
528 |
Measurement
of D->A
Momentum Aperture and Test of D->A Field Qualitites |
M. Halling |
2/27/92 |
|
529 |
Tuning
the Dispersion in the
Accumulator |
V. Visjnic |
9/1/92 |
|
530 |
Feasibility
Study for the Accumulator upgrade |
V. Visjnic |
9/1/92 |
|
531 |
Debuncher
Microwave Absorber
Test of Jan 92 |
K. Fullett |
1/1/93 |
|
532 |
Summary
of Recent Target
Studies |
F.
Bieniosek & S. O'Day |
2/4/93 |
|
533 |
Electro-Optical
Technology
Applied to Accelerator Beam Measurement and Control |
R.
Pasquinelli |
5/1/93 |
|
534 |
Performance
of the Upgrade
Stacktail Momentum Cooling System in the Fermilab Antiproton Source |
R.
Pasquinelli/D. McGinnis |
5/1/93 |
|
535 |
Measurement
of Escaping Ions
in the Fermilab Antiproton Accumulator |
P. Zhou, et
al |
5/1/93 |
|
536 |
Trapped
Ions and Beam
Coherent Instability |
P. Zhou, et
al |
5/1/93 |
|
537 |
Transverse
Emittance Growth
in the Fermilab Antiproton Accumulator with High Current Antiproton
Stacks |
S. Werkema,
D. Peterson |
5/1/93 |
|
538 |
New Target
Results from the FNAL Antiproton Source |
F.
Bieniosek & S. O'Day |
5/1/93 |
|
539 |
Measurment
of Trapped Ion
Pockets and Control of Ion Instabilities in the Fermilab Antiproton
Accumulator |
S. Werkema,
K. Fullett, & P. Zhou |
5/1/93 |
|
540 |
Antiproton
Extraction in the
Fermilab Antiproton Accumulator |
M. Church
& S. O'Day |
5/1/93 |
|
541 |
Observation
of the
coalescing of Beam into an Asymmetric RF Bucket by Stochastic Cooling |
A. Halling
& W.P. Lu |
5/1/93 |
|
542 |
Reliabilty
of the Fermilab
Antiproton Source |
E. Harms |
5/1/93 |
|
543 |
Effects
fo Transverse
Coupling on Transverse Beam Size Simulation & Measurements |
A. Halling |
5/1/93 |
|
544 |
The
Design and Perforomance
of a High Sensitivity Loss Montior System for use in the Fermilab
Antiproton Rings |
A. Halling |
5/1/93 |
|
545 |
A 10 um
Resolution Secondary
Emmission Monitor for Fermilab's Targeting Station |
P. Hurh, S.
O'Day, R. Dombrowski, & T. Page |
5/1/93 |
|
546 |
Lithium
Lens for Focusing
Protons on Target in the Fermilab Antiproton Source |
F.
Bieniosek & K. Anderson |
5/1/93 |
|
547 |
New
Target Results from the
FNAL Antiproton Source |
F.
Bieniosek & S. O'Day |
5/1/93 |
|
548 |
Measurement
of Transverse
Emittance as a Function of Revolution Frequency and Beam Current in the
Accumulator |
R.
Alves-Pires |
8/30/93 |
|
549 |
Reducing Ohmic Heating In the Lithium Lens by Smoothing the Current
Pulse |
F. Bieniosek |
10/6/93 |
|
550 |
Consequences
of a Lithium
Lens Failure |
F. Bieniosek |
2/16/94 |
|
551 |
Study of
Recent Problems
with Stacktail Cooling System |
V. Visjnic |
3/1/94 |
|
552 |
Deceleration
and Collider
Mode for the Fermilab Antiproton Accumulator |
S. Maury
& M. Church |
10/1/94 |
|
553 |
Control
of Trapped Ion
Instabilities in the Fermilab Antiproton Accumulator |
S. Werkema |
5/1/95 |
|
554 |
Requirements
for a Beam
Sweeping System for the Fermilab Antiproton Source Target |
F.
Bieniosek, K. Anderson, & K. Fullett |
6/1/95 |
|
555 |
Measurement
and Reduction of
Quadrupole Injection Oscillations in the Fermilab Antiproton Accumulator |
F.
Bieniosek & K. Fullett |
6/1/95 |
|
556 |
Summary
of Results from the
Beam Sweep Test Module |
F. Bieniosek |
6/1/95 |
|
557 |
Scale
Model of a Solid-State
Driver for the Beam Sweep Magnet |
F. Bieniosek |
8/1/95 |
|
558 |
Emittance
Growth in Recent
Antiproton Transfers form Accumulator to Main Ring |
F. Bieniosek |
9/1/95 |
|
559 |
Performance
of the
Antirpoton Source During Run 1b |
S. Werkema |
9/1/95 |
|
560 |
Summary
of Proton Stacking
2/96 |
M. Church |
5/28/96 |
|
561 |
Beam-Sweep
Magnet With
Rotatin Dipole Field |
F. Bieniosek |
6/21/96 |
|
562 |
Calculations
of Transverse
Heating in the Antiproton Accumulator |
K. Bertsche |
8/14/96 |
|
563 |
Reduction
of Feedbak-Driven
Transverse Heating in the Antiproton Accumulator |
K. Bertsche |
8/16/96 |
|
564 |
Debuncher
4-8 GHz Pickup Tests |
D. McGinnis |
4/14/97 |
|
565 |
Debuncher
4-8 GHz Pickup
Test II |
D. McGinnis |
5/12/97 |
|
566 |
Electromagnetic
Properties
of Eccosorb MF190 |
D. McGinnis |
5/15/97 |
|
567 |
Lattice
function
Measurements in Fermilab Accumulator Ring |
M. Church |
5/23/97 |
|
568 |
Developement
of a Beam
Sweeping System for Fermilab Antiproton Source Target |
F. Bieniosek |
5/29/97 |
|
569 |
Some
Results on TeV 1
Quadrupole Magnet |
B.Brown |
9/22/97 |
|
570 |
Report on
Development of
Beams Sweeping Equipment |
O.
Kurnaw/A.Cherepekhin |
9/26/97 |
|
571 |
Recent
APZ Studies
&Proposal to Increase Aperture to 40 Pi-mm-mrad |
M. Church |
10/6/97 |
|
572 |
|
|
|
|
573 |
Debuncher
Stochastic Cooling
Upgrade for Run II and Beyond |
J. Marriner |
4/1/98 |
|
574 |
Simulations
of Transverse
Stochastic Cooling Using the Fokker-Planck Equation |
J. Marriner |
3/16/98 |
|
575 |
Moment
Method Formulation
for Beam Excitation of Waveguide Slots |
D. McGinnis |
7/27/97 |
|
576 |
Measurement
of Complex for
Permittivity and Permeability of Microwave Absorber Eccosorb MF-190 |
D. Sun |
8/1/97 |
|
577 |
Optimization
of the 4.75
Slow Wave Pickup for the Debuncher Upgrade |
D. McGinnis |
10/25/97 |
|
578 |
New
Definition of Stochastic
Cooling Kicker and Pickup Impedances |
D. McGinnis |
3/2/98 |
|
579 |
4-8 GHZ
Debuncher Upgrade
Array Dimensions |
D. McGinnis |
3/1/98 |
|
580 |
4-8 GHZ
Debuncher Upgrade
Array Impedance Response |
D. McGinnis |
3/22/98 |
|
581 |
Simple
Heat Transfer
Calculations for the Microwave Absorber In the Debuncher Upgrade |
D. McGinnis |
3/22/98 |
|
582 |
Preliminary
Power Tests On
the 6 GHZ Kicker |
D. McGinnis |
3/26/98 |
|
583 |
Attenuation
of Waveguide
Modes with Absorbing Walls |
D. McGinnis |
4/10/98 |
|
584 |
Comparison
Between A Lossy
Magnetic Absorber and A Lossy Electric Absorber |
D. McGinnis |
4/10/98 |
|
585 |
Measurement
of Relative
Permittivity and Permeability Using Two Port S-Parameter Technique |
D. McGinnis |
4/13/98 |
|
586 |
Transmission
of Stochastic
Cooling Signals in the Recycler Ring Using TEo1 |
D. McGinnis |
3/4/98 |
|
587 |
Sensitivity
of Slow Wave
Pickups versus Aperture |
D. McGinnis |
Apr-98 |
|
588 |
Moving
Elements in the Pbar
Source Debuncher to Accumulator Line to Facilitate the Debuncher
Cooling Upgrade |
A.
Sondgeroth |
2/16/98 |
|
589 |
Antiproton
source
Operational Summary over the E835/E862 Run |
J. Morgan |
Apr-98 |
|
590 |
Evaluation
of the 4-8 GHz
Debuncher Upgrade Prototype Stochastic cooling Pickup & Kicker |
D. McGinnis |
5/9/98 |
|
591 |
The Effect
of Sidebar
Absorbers on the Frequency Response of Slow Wave Kickers |
D. McGinnis |
5/31/98 |
|
592 |
First
Attempt at Designing
an Isolating Absorber for Horizontal Band 1 of the Debuncher |
D. McGinnis |
6/6/98 |
|
593 |
A Feedback
Notch Filter |
D. McGinnis |
6/22/98 |
|
594 |
Analysis of
Microwave
Properties for Various Absorbing Materials |
D. McGinnis |
6/30/98 |
|
595 |
Increasing
the Transverse
Aperture of the AP2 Debuncher injection region |
F. Bieniosek |
6/30/98 |
|
596 |
Attenuation
of Waveguide
Modes with Multi-layer Absorbing Walls |
D. McGinnis |
7/15/98 |
|
597 |
Attenuation
of Waveguide
Modes with Resistively coated Dielectric walls |
D. McGinnis |
7/23/98 |
|
598 |
Vacuum
Properties of Some
Microwave absorbers |
D. Sun |
Jul-98 |
|
599 |
Measurement
results of
Permittivity/Permeability/Loss Tangent of Several Microwave absorbers |
D. Sun |
Jul-98 |
|
600 |
Dimension
Data of
Coax-Waveguide couplers and Waveguide Terminators |
D. Sun |
May-98 |
|