Fermilab NOvA Target Group


Home

·         Phase A – Procurement and Fabrication of ME Target Carrier

·         Phase B - Fabrication, Assembly and Alignment of ME Mark II Target

·         Phase C – Acceptance and Certification of ME Target

·         Phase D – ME Target Assembly Final Details and Alignment  

·         Phase E – ME Target Assembly Final Alignment

·         Phase F – ME Target Change Out

·         Phases 1, 2 & 3 - ME Target Carrier Assembly

·         Target Helium Space Back Fill Procedure and Schematic

·         Welding Procedure

 

·         Fermilab Target Mark II MET-07 (Drawings and Documentation)

·         Baffle, Mark II Drawing 433950

·         TC-07 Drawing Package

·         Fermilab Target Mark II MET-06 (Drawings and Documentation)

·         Baffle, Mark II Drawing 433950

·         TC-06 Drawing Package

·         Fermilab Target Mark II MET-05 (Drawings and Documentation)

·         Baffle, Mark II Drawing 433950

·         TC-05 Drawing Package

·         Fermilab Target Mark II MET-04 (Drawings and Documentation)

·         Baffle, Mark II Drawing  433950

·         TC-04 Drawing Package

·   RAL Target Mark II (MET-03)

·   Baffle MEB-03, Drawings 433950; 433957, 433956, 433955, 433954, 433953, 433952, 433951, 433948, 433947

·   TC-03 Drawing Package

·   Wiring Diagram ME-433998

·   Thermal and Water Flow Testing

·         Completed Travelers

·         Photos

·         Fermilab Target Mark II (MET-02), Beryllium Fin R&D

·         TC-01 Drawing Package

·         Baffle MEB-02, Drawings 433950; 433957, 433956, 433955, 433954, 433953, 433952, 433951, 433948, 433947

·         Thermal and Water Flow Testing

·         Completed Travelers

·         Photos

·         RAL Target (MET-01)

·         Baffle MEB-01, Drawings 433950; 433957, 433956, 433955, 433954, 433953, 433952, 433951, 433948, 433947

·         TC-02 Drawing Package

·         Wiring Diagram: ME-433885

·         Instrumentation: Hiep's Assignment List, Wiring Diagram ME-433885

·         Thermal, Water Flow Measurement, DS Hanger Work and Pressure Testing

·         Completed Travelers

·         Photos

·         Alignment

·         Installation

 

 

 

 

 

Thin Window Summary

Pictures

 