Phase A – Procurement
and Fabrication of ME Target Carrier
·
Phase B - Fabrication,
Assembly and Alignment of ME Mark II Target
·
Phase C – Acceptance
and Certification of ME Target
·
Phase
D – ME
Target Assembly Final Details and Alignment
·
Phase E – ME
Target Assembly Final Alignment
·
Phase F – ME
Target Change Out
·
Phases
1, 2 & 3 - ME Target
Carrier Assembly
·
Target
Helium Space Back Fill Procedure
and Schematic
·
Welding
Procedure
·
Fermilab Target Mark
II MET-07 (Drawings and Documentation)
·
Baffle, Mark
II Drawing 433950
·
Fermilab Target Mark
II MET-06 (Drawings and Documentation)
·
Baffle, Mark
II Drawing 433950
·
Fermilab
Target Mark II MET-05 (Drawings and Documentation)
·
Baffle, Mark
II Drawing 433950
·
Fermilab
Target Mark II MET-04 (Drawings and Documentation)
·
Baffle, Mark
II Drawing 433950
·
Baffle MEB-03, Drawings 433950; 433957, 433956, 433955, 433954, 433953, 433952, 433951, 433948, 433947
·
Wiring
Diagram ME-433998
·
Thermal and
Water Flow Testing
·
Completed
Travelers
·
Photos
·
Fermilab Target Mark II (MET-02), Beryllium Fin R&D
·
TC-01
Drawing Package
·
Baffle MEB-02, Drawings 433950; 433957, 433956, 433955, 433954, 433953, 433952, 433951, 433948, 433947
·
Thermal and
Water Flow Testing
·
Completed
Travelers
·
Photos
·
Baffle MEB-01, Drawings 433950; 433957, 433956, 433955, 433954, 433953, 433952, 433951, 433948, 433947
·
Wiring
Diagram: ME-433885
·
Instrumentation:
Hiep's Assignment List,
Wiring Diagram ME-433885
·
Thermal, Water Flow Measurement, DS Hanger
Work and Pressure Testing
·
Completed
Travelers
·
Photos
·
Installation